East Anglia's Waterfront Town | Princes Street (Ipswich) Office Corridor |

SnOasis

Discussion in 'Great Blakenham' started by Ipswi, May 20, 2017.

  1. Ipswi

    IpswiGuest

    Further documents have been filed for the on-going proposed SnOasis winter sports complex project at Great Blakenham.

    SnOasis is a controversial proposed indoor winter sports resort in Great Blakenham near Ipswich, Suffolk UK currently scheduled to open in 2020. It is planned be the largest real snow indoor ski slope in the world with a 415 metre long slope, 70 metre wide run, and a 100 metre drop; accommodating 1000 skiers per hour. There are several comparable slopes, including one at Neuss, Germany, but none have a vertical drop of 100 metres and the overall ski area of SnOasis will be more than double that of any other indoor ski slope in the world.

    The project is being promoted by Onslow Suffolk Ltd with a budget of £300 million and would create around 1800 new jobs in the local area once fully open, and 3500 jobs created during the construction phase. There is a separate proposal to build 537 new homes adjacent to the site. The scheme is being opposed by SnOasis Community Alliance which represents 11 town and parish councils and by SnOasis Concern.

    This project appears to be unlikely but it would really boost the Greater Ipswich economy and bring tourism from across Europe to Ipswich and the Suffolk coast. We have no local theme parks in this part of the county or a destination attraction of that magnitude.
    4494/16 | Application for approval of Reserved Matters (phases 1 - 8), pursuant to Outline Permission ref. 1969/10 (for the development known as 'SnOasis'). | Land at Field Quarry (Known as Masons Quarry), Bramford Road, Great Blakenham, IP6 0XJ
































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































    Date publishedDocument TypeViewDescription
    28 Oct 2016Application FormApplication Form-695336.pdfPHASE 1 APPLICATION FORM
    28 Oct 2016Application FormApplication Form-695374.pdfPHASE 2 APPLICATION FORM
    28 Oct 2016Application FormApplication Form-695445.pdfPHASE 3 APPLICATION FORM
    28 Oct 2016Application FormApplication Form-695509.pdfPHASE 4 APPLICATION FORM
    28 Oct 2016Application FormApplication Form-695546.pdfPHASE 5 APPLICATION FORM
    28 Oct 2016Application FormApplication Form-695729.pdfPHASE 6 APPLICATION FORM
    28 Oct 2016Application FormApplication Form-695867.pdfPHASE 7 APPLICATION FORM
    28 Oct 2016Application FormApplication Form-695905.pdfPHASE 8 APPLICATION FORM
    28 Oct 2016DrawingDrawing-696041.pdfEXISTING SITE TOPOGRAPHY SITE SURVEY - SEPT 2011
    28 Oct 2016DrawingDrawing-696030.pdfGA SITE PHASING PLAN
    28 Oct 2016DrawingDrawing-696039.pdfKEY PLAN SITE SECTIONS
    31 Oct 2016DrawingDrawing-695298.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 1 OF 15)
    31 Oct 2016DrawingDrawing-695312.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 10 OF 15)
    31 Oct 2016DrawingDrawing-696188.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 11 OF 15)
    28 Oct 2016DrawingDrawing-696052.pdfPROPOSED SITE SECTION 06 - PHASE 3/4/5/7
    28 Oct 2016DrawingDrawing-696037.pdfROOF LEVEL SITE PLAN
    28 Oct 2016DrawingDrawing-696029.pdfSITE PLAN - DEVELOPMENT AREA BOUNDARIES
    28 Oct 2016DrawingDrawing-696040.pdfSITE PLAN PROPOSED GROUND FLOOR LEVELS AT BUILDING PERMETER
    28 Oct 2016DrawingDrawing-696061.pdfPROPOSED SITE SECTION - SECTION 12
    28 Oct 2016DrawingDrawing-696066.pdfPROPOSED SITE SECTION - SECTION 13
    28 Oct 2016DrawingDrawing-696068.pdfPROPOSED SITE SECTION - SECTION 14
    28 Oct 2016DrawingDrawing-696069.pdfPROPOSED SITE SECTION - SECTION 15
    28 Oct 2016DrawingDrawing-696046.pdfPROPOSED SITE SECTION 04 - PHASE 3/5
    28 Oct 2016DrawingDrawing-696049.pdfPROPOSED SITE SECTION 05 - PHASE 3/4/5/7
    28 Oct 2016DrawingDrawing-696045.pdfPROPOSED SITE PLAN - SECTION 03
    28 Oct 2016DrawingDrawing-696053.pdfPROPOSED SITE SECTION - SECTION 07
    28 Oct 2016DrawingDrawing-696054.pdfPROPOSED SITE SECTION - SECTION 08
    28 Oct 2016DrawingDrawing-696055.pdfPROPOSED SITE SECTION - SECTION 09
    28 Oct 2016DrawingDrawing-696056.pdfPROPOSED SITE SECTION - SECTION 10
    28 Oct 2016DrawingDrawing-696057.pdfPROPOSED SITE SECTION - SECTION 11
    28 Oct 2016DrawingDrawing-695925.pdfPHASE 8 PROPOSED TYPICAL CHALETS LEVEL 01 & ROOF LEVEL GA PLANS
    28 Oct 2016DrawingDrawing-695918.pdfPHASE 8 ROOF LEVEL BLOCK PLAN 1 OF 2
    28 Oct 2016DrawingDrawing-695920.pdfPHASE 8 ROOF LEVEL BLOCK PLAN 2 OF 2
    28 Oct 2016DrawingDrawing-696042.pdfPROPOSED GROUND FLOOR LEVELS AT BUILDING PERIMETER
    28 Oct 2016DrawingDrawing-696043.pdfPROPOSED SITE PLAN - SECTION 01
    28 Oct 2016DrawingDrawing-696044.pdfPROPOSED SITE PLAN - SECTION 02
    28 Oct 2016DrawingDrawing-695944.pdfPHASE 8 PROPOSED 3 BEDROOM 3 TERRACE UNIT TYPICAL ELEVATIONS & ENLARGED BAY PLAN
    28 Oct 2016DrawingDrawing-695942.pdfPHASE 8 PROPOSED 3 BEDROOM DETACHED CHALET TYPICAL ELEVATIONS & ENLARGED BAY PLA
    28 Oct 2016DrawingDrawing-695932.pdfPHASE 8 PROPOSED 4 BEDROOM DETACHED CHALET TYPICAL ELEVATIONS & ENLARGED BAY PLA
    28 Oct 2016DrawingDrawing-695966.pdfPHASE 8 PROPOSED CHALET & COUNTRY CLUB TYPICAL SECTIONS
    28 Oct 2016DrawingDrawing-695959.pdfPHASE 8 PROPOSED CONTRY CLUB ELEVATIONS & ENLARGED BAY PLAN/ELEVATIONS
    28 Oct 2016DrawingDrawing-695928.pdfPHASE 8 PROPOSED COUNTRY CLUB LEVEL 01, 02 & ROOF LEVEL GA PLANS
    14 May 2017DrawingDrawing-745852.pdfPHASE 8 - 8401P05
    14 May 2017DrawingDrawing-745853.pdfPHASE 8 - 8402P05
    14 May 2017DrawingDrawing-745854.pdfPHASE 8 - 8403P05
    14 May 2017DrawingDrawing-745855.pdfPHASE 8 - 8500P05
    28 Oct 2016DrawingDrawing-695915.pdfPHASE 8 LEVEL 01 BLOCK PLAN 1 OF 2
    28 Oct 2016DrawingDrawing-695917.pdfPHASE 8 LEVEL 01 BLOCK PLAN 2 OF 2
    14 May 2017DrawingDrawing-745846.pdfPHASE 8 - 8121P08
    14 May 2017DrawingDrawing-745847.pdfPHASE 8 - 8130P07
    14 May 2017DrawingDrawing-745848.pdfPHASE 8 - 8131P08
    14 May 2017DrawingDrawing-745849.pdfPHASE 8 - 8360P05
    14 May 2017DrawingDrawing-745850.pdfPHASE 8 - 8361P04
    14 May 2017DrawingDrawing-745851.pdfPHASE 8 - 8400P05
    28 Oct 2016DrawingDrawing-695895.pdfPHASE 7 PROPOSED ACADEMY DOME ENLARGED BAY PLANS/ELEVATIONS
    28 Oct 2016DrawingDrawing-695886.pdfPHASE 7 PROPOSED ACADEMY DOME LEVEL 00 & 01 GA PLAN
    28 Oct 2016DrawingDrawing-695888.pdfPHASE 7 PROPOSED ACADEMY DOME ROOF LEVEL GA PLAN
    28 Oct 2016DrawingDrawing-695897.pdfPHASE 7 PROPOSED ACADEMY DOME SECTIONS A-A & B-B
    28 Oct 2016DrawingDrawing-695877.pdfPHASE 7 ROOF LEVEL BLOCK PLAN
    14 May 2017DrawingDrawing-745845.pdfPHASE 8 - 8120P07
    14 May 2017DrawingDrawing-745843.pdfPHASE 7 - 7402P03
    14 May 2017DrawingDrawing-745844.pdfPHASE 7 - 7500P03
    28 Oct 2016DrawingDrawing-695875.pdfPHASE 7 LEVEL 00 BLOCK PLAN
    28 Oct 2016DrawingDrawing-695876.pdfPHASE 7 LEVEL 01 BLOCK PLAN
    28 Oct 2016DrawingDrawing-695893.pdfPHASE 7 PROPOSED ACADEMY DOME ELEVATIONS 1-1 & 2-2
    28 Oct 2016DrawingDrawing-695891.pdfPHASE 7 PROPOSED ACADEMY DOME ELEVATIONS 1-1, 2-2 & 3-3
    14 May 2017DrawingDrawing-745835.pdfPHASE 7 - 7110P04
    14 May 2017DrawingDrawing-745837.pdfPHASE 7 - 7120P04
    14 May 2017DrawingDrawing-745839.pdfPHASE 7 - 7300P03
    14 May 2017DrawingDrawing-745840.pdfPHASE 7 - 7310P03
    14 May 2017DrawingDrawing-745841.pdfPHASE 7 - 7400P03
    14 May 2017DrawingDrawing-745842.pdfPHASE 7 - 7401P04
    28 Oct 2016DrawingDrawing-695827.pdfPHASE 6 PROPOSED SPORTS CENTRE LEVEL 02 GA PLAN
    28 Oct 2016DrawingDrawing-695828.pdfPHASE 6 PROPOSED SPORTS CENTRE ROOF LEVEL GA PLAN
    28 Oct 2016DrawingDrawing-695833.pdfPHASE 6 PROPOSED SPORTS CENTRE TYPICAL ELEVATIONS & ENLARGED BAY PLANS/ELEVATION
    28 Oct 2016DrawingDrawing-695825.pdfPHASE 6 PROPOSED TYPICAL HOSTEL LEVEL 01 & ROOF LEVEL GA PLANS
    28 Oct 2016DrawingDrawing-695749.pdfPHASE 6 ROOF LEVEL BLOCK PLAN
    14 May 2017DrawingDrawing-745830.pdfPHASE 7 - 7100P04
    28 Oct 2016DrawingDrawing-695841.pdfPHASE 6 PROPOSED HOSTEL BUILDING & SPORTS CENTRE LEVEL 01, 02 AND ROOF LEVEL TYP
    28 Oct 2016DrawingDrawing-695830.pdfPHASE 6 PROPOSED HOSTEL BUILDING TYPICAL ELEVATIONS & ENLARGED BAY PLAN/ELEVATIO
    28 Oct 2016DrawingDrawing-695839.pdfPHASE 6 PROPOSED SPEED SKATING TRACK & BASEMENT CAR PARK TYPICAL SECTIONAL ELEVA
    28 Oct 2016DrawingDrawing-695822.pdfPHASE 6 PROPOSED SPEED SKATING TRACK LEVEL 01 SHEET 1 OF 2
    28 Oct 2016DrawingDrawing-695824.pdfPHASE 6 PROPOSED SPEED SKATING TRACK LEVEL 01 SHEET 2 OF 2
    28 Oct 2016DrawingDrawing-695826.pdfPHASE 6 PROPOSED SPORTS CENTRE LEVEL 01 GA PLAN
    28 Oct 2016DrawingDrawing-695744.pdfPHASE 6 LEVEL 01 BLOCK PLAN
    28 Oct 2016DrawingDrawing-695747.pdfPHASE 6 LEVEL 02 BLOCK PLAN
    28 Oct 2016DrawingDrawing-695790.pdfPHASE 6 PROPOSED BASEMENT CAR PARKING LEVEL 00 SHEET 1 OF 2
    28 Oct 2016DrawingDrawing-695820.pdfPHASE 6 PROPOSED BASEMENT CAR PARKING LEVEL 00 SHEET 2 OF 2
    28 Oct 2016DrawingDrawing-695761.pdfPHASE 6 PROPOSED BASEMENT CAR PARKING LEVEL 01 SHEET 1 OF 2
    28 Oct 2016DrawingDrawing-695762.pdfPHASE 6 PROPOSED BASEMENT CAR PARKING LEVEL 01 SHEET 2 OF 2
    14 May 2017DrawingDrawing-745802.pdfPHASE 6 - 6420P03
    14 May 2017DrawingDrawing-745803.pdfPHASE 6 - 6430P03
    14 May 2017DrawingDrawing-745804.pdfPHASE 6 - 6500P03
    14 May 2017DrawingDrawing-745805.pdfPHASE 6 - 6520P03
    28 Oct 2016DrawingDrawing-695743.pdfPHASE 6 LEVEL 00 BLOCK PLAN
    28 Oct 2016DrawingDrawing-695741.pdfPHASE 6 LEVEL 01 BLOCK PLAN
    28 Oct 2016DrawingDrawing-695685.pdfPHASE 5 PROPOSED VILLAGE CENTRE SECTIONS A-A & B-B
    14 May 2017DrawingDrawing-745797.pdfPHASE 6 - 6100P05
    14 May 2017DrawingDrawing-745798.pdfPHASE 6 - 6110P04
    14 May 2017DrawingDrawing-745799.pdfPHASE 6 - 6120P04
    14 May 2017DrawingDrawing-745800.pdfPHASE 6 - 6130P05
    14 May 2017DrawingDrawing-745801.pdfPHASE 6 - 6140P04
    28 Oct 2016DrawingDrawing-695574.pdfPHASE 5 PROPOSED VILLAGE CENTRE ENLARGED BAY PLANS/ELEVATIONS
    28 Oct 2016DrawingDrawing-695566.pdfPHASE 5 PROPOSED VILLAGE CENTRE LEVEL 01 GA PLAN
    28 Oct 2016DrawingDrawing-695567.pdfPHASE 5 PROPOSED VILLAGE CENTRE LEVEL 02 GA PLAN
    28 Oct 2016DrawingDrawing-695573.pdfPHASE 5 PROPOSED VILLAGE CENTRE OFFICES ELEVATIONS 1.1, 2.2, 3.3 & 4.4
    28 Oct 2016DrawingDrawing-695593.pdfPHASE 5 PROPOSED VILLAGE CENTRE OFFICES ELEVATIONS 1.1, 2.2, 3.3 & 4.4
    28 Oct 2016DrawingDrawing-695568.pdfPHASE 5 PROPOSED VILLAGE CENTRE ROOF LEVEL GA PLAN
    28 Oct 2016DrawingDrawing-695598.pdfPHASE 5 PROPOSED VILLAGE APARTMENTS ELEVATIONS 1-1 & 2-2
    28 Oct 2016DrawingDrawing-695606.pdfPHASE 5 PROPOSED VILLAGE APARTMENTS EMLARGED BAY PLANS/ELEVATIONS 2 OF 2
    28 Oct 2016DrawingDrawing-695600.pdfPHASE 5 PROPOSED VILLAGE APARTMENTS ENLARGED BAY PLANS/ ELEVATIONS
    28 Oct 2016DrawingDrawing-695564.pdfPHASE 5 PROPOSED VILLAGE APARTMENTS LEVEL 01 & 02 GA PLAN
    28 Oct 2016DrawingDrawing-695565.pdfPHASE 5 PROPOSED VILLAGE APARTMENTS LEVEL 03 & ROOF GA PLANS
    28 Oct 2016DrawingDrawing-695687.pdfPHASE 5 PROPOSED VILLAGE APARTMENTS SECTION A-A
    28 Oct 2016DrawingDrawing-695688.pdfPHASE 5 PROPOSED HOTEL SECTION A-A
    28 Oct 2016DrawingDrawing-695680.pdfPHASE 5 PROPOSED PARKLAND PAVILLION APARTMENTS TYPICAL SECTIONS A-A & B-B
    28 Oct 2016DrawingDrawing-695569.pdfPHASE 5 PROPOSED PAVILLION APARTMENTS LEVELS 01, 02 & ROOF GA PLANS
    28 Oct 2016DrawingDrawing-695570.pdfPHASE 5 PROPOSED PAVILLION APARTMENTS TYPICAL ELEVATIONS & ENLARGED BAY PLANS/EL
    28 Oct 2016DrawingDrawing-695572.pdfPHASE 5 PROPOSED PAVILLION ELEVATIONS
    28 Oct 2016DrawingDrawing-695602.pdfPHASE 5 PROPOSED VILLAGE APARTMENTS ELEVATION 1-1
    28 Oct 2016DrawingDrawing-695557.pdfPHASE 5 PROPOSED HOTEL LEVEL 01 GA PLAN
    28 Oct 2016DrawingDrawing-695558.pdfPHASE 5 PROPOSED HOTEL LEVEL 02 GA PLAN
    28 Oct 2016DrawingDrawing-695559.pdfPHASE 5 PROPOSED HOTEL LEVEL 03 GA PLAN
    28 Oct 2016DrawingDrawing-695560.pdfPHASE 5 PROPOSED HOTEL LEVEL 04 GA PLAN
    28 Oct 2016DrawingDrawing-695561.pdfPHASE 5 PROPOSED HOTEL LEVEL 05 GA PLAN
    28 Oct 2016DrawingDrawing-695562.pdfPHASE 5 PROPOSED HOTEL ROOF LEVEL GA PLAN
    28 Oct 2016DrawingDrawing-695607.pdfPHASE 5 PROPOSED HOTEL ELEVATIONS 1-1 & 4-4
    28 Oct 2016DrawingDrawing-695609.pdfPHASE 5 PROPOSED HOTEL ELEVATIONS 2-2
    28 Oct 2016DrawingDrawing-695673.pdfPHASE 5 PROPOSED HOTEL ELEVATIONS 2-2 & 4-4
    28 Oct 2016DrawingDrawing-695610.pdfPHASE 5 PROPOSED HOTEL ELEVATIONS 3-3, 5-5 & 6-6
    28 Oct 2016DrawingDrawing-695671.pdfPHASE 5 PROPOSED HOTEL ENLARGED BAY PLANS/ELEVATIONS
    28 Oct 2016DrawingDrawing-695556.pdfPHASE 5 PROPOSED HOTEL LEVEL 00 GA PLAN
    28 Oct 2016DrawingDrawing-695555.pdfPHASE 5 LEVEL 03 BLOCK PLAN
    28 Oct 2016DrawingDrawing-695553.pdfPHASE 5 LEVEL 04 BLOCK PLAN
    28 Oct 2016DrawingDrawing-695554.pdfPHASE 5 LEVEL 05 BLOCK PLAN
    28 Oct 2016DrawingDrawing-695675.pdfPHASE 5 PROPOSED CONVIENCE STORE ELEVATIONS 1-1, 2-2, 3-3 & 4-4
    28 Oct 2016DrawingDrawing-695677.pdfPHASE 5 PROPOSED CONVIENCE STORE ENLARGED BAY PLANS/ELEVATIONS
    28 Oct 2016DrawingDrawing-695691.pdfPHASE 5 PROPOSED CONVIENCE STORE SECTIONS A-A & B-B
    14 May 2017DrawingDrawing-745795.pdfPHASE 5 - 5530P04
    14 May 2017DrawingDrawing-745796.pdfPHASE 5 - 5540P04
    28 Oct 2016DrawingDrawing-695549.pdfPHASE 5 LEVEL 00 BLOCK PLAN
    28 Oct 2016DrawingDrawing-695550.pdfPHASE 5 LEVEL 01 BLOCK PLAN
    28 Oct 2016DrawingDrawing-695551.pdfPHASE 5 LEVEL 02 BLOCK PLAN
    28 Oct 2016DrawingDrawing-695552.pdfPHASE 5 LEVEL 03 BLOCK PLAN
    14 May 2017DrawingDrawing-745789.pdfPHASE 5 - 5434P02
    14 May 2017DrawingDrawing-745790.pdfPHASE 5 - 5440P04
    14 May 2017DrawingDrawing-745791.pdfPHASE 5 - 5441P03
    14 May 2017DrawingDrawing-745792.pdfPHASE 5 - 5500P04
    14 May 2017DrawingDrawing-745793.pdfPHASE 5 - 5510P04
    14 May 2017DrawingDrawing-745794.pdfPHASE 5 - 5520P04
    14 May 2017DrawingDrawing-745782.pdfPHASE 5 - 5422P02
    14 May 2017DrawingDrawing-745783.pdfPHASE 5 - 5423P01
    14 May 2017DrawingDrawing-745784.pdfPHASE 5 - 5430P04
    14 May 2017DrawingDrawing-745786.pdfPHASE 5 - 5431P04
    14 May 2017DrawingDrawing-745787.pdfPHASE 5 - 5432P04
    14 May 2017DrawingDrawing-745788.pdfPHASE 5 - 5433P02
    14 May 2017DrawingDrawing-745776.pdfPHASE 5 - 5401P04
    14 May 2017DrawingDrawing-745777.pdfPHASE 5 - 5410P04
    14 May 2017DrawingDrawing-745778.pdfPHASE 5 - 5411P02
    14 May 2017DrawingDrawing-745779.pdfPHASE 5 - 5412P02
    14 May 2017DrawingDrawing-745780.pdfPHASE 5 - 5420P04
    14 May 2017DrawingDrawing-745781.pdfPHASE 5 - 5421P02
    14 May 2017DrawingDrawing-745770.pdfPHASE 5 - 5320P04
    14 May 2017DrawingDrawing-745771.pdfPHASE 5 - 5321P04
    14 May 2017DrawingDrawing-745772.pdfPHASE 5 - 5322P04
    14 May 2017DrawingDrawing-745773.pdfPHASE 5 - 5330P04
    14 May 2017DrawingDrawing-745774.pdfPHASE 5 - 5350P05
    14 May 2017DrawingDrawing-745775.pdfPHASE 5 - 5400P06
    14 May 2017DrawingDrawing-745764.pdfPHASE 5 - 5303P05
    14 May 2017DrawingDrawing-745765.pdfPHASE 5 - 5304P05
    14 May 2017DrawingDrawing-745766.pdfPHASE 5 - 5305P05
    14 May 2017DrawingDrawing-745767.pdfPHASE 5 - 5306P05
    14 May 2017DrawingDrawing-745768.pdfPHASE 5 - 5310P04
    14 May 2017DrawingDrawing-745769.pdfPHASE 5 - 5311P04
    14 May 2017DrawingDrawing-745758.pdfPHASE 5 - 5104P04
    14 May 2017DrawingDrawing-745759.pdfPHASE 5 - 5105P04
    14 May 2017DrawingDrawing-745760.pdfPHASE 5 - 5106P04
    14 May 2017DrawingDrawing-745761.pdfPHASE 5 - 5300P04
    14 May 2017DrawingDrawing-745762.pdfPHASE 5 - 5301P04
    14 May 2017DrawingDrawing-745763.pdfPHASE 5 - 5302P05
    28 Oct 2016DrawingDrawing-695518.pdfPHASE 4 PROPOSED ENTERTAINMENT DOME LEVEL 02 & ROOF GA PLAN
    28 Oct 2016DrawingDrawing-695511.pdfPHASE 4 PROPOSED ENTERTAINMENT DOME LEVEL 02 & ROOF LEVEL GA PLAN
    14 May 2017DrawingDrawing-745754.pdfPHASE 5 - 5100P04
    14 May 2017DrawingDrawing-745755.pdfPHASE 5 - 5101P04
    14 May 2017DrawingDrawing-745756.pdfPHASE 5 - 5102P04
    14 May 2017DrawingDrawing-745757.pdfPHASE 5 - 5103P04
    28 Oct 2016DrawingDrawing-695514.pdfPHASE 4 LEVEL 01 BLOCK PLAN
    28 Oct 2016DrawingDrawing-695515.pdfPHASE 4 LEVEL 02 BLOCK PLAN
    28 Oct 2016DrawingDrawing-695519.pdfPHASE 4 PROPOSED ENTERTAINMENT DOME ELEVATIONS 1-1, 2-2 & 3-3
    28 Oct 2016DrawingDrawing-695521.pdfPHASE 4 PROPOSED ENTERTAINMENT DOME ELEVATIONS 1-1, 2-2 & 3-3
    28 Oct 2016DrawingDrawing-695522.pdfPHASE 4 PROPOSED ENTERTAINMENT DOME ENLARGED BAY PLANS/ELEVATIONS
    28 Oct 2016DrawingDrawing-695516.pdfPHASE 4 PROPOSED ENTERTAINMENT DOME LEVEL 00 & 01 GA PLAN
    14 May 2017DrawingDrawing-745750.pdfPHASE 4 - 4400P03
    14 May 2017DrawingDrawing-745751.pdfPHASE 4 - 4401P04
    14 May 2017DrawingDrawing-745752.pdfPHASE 4 - 4402P03
    14 May 2017DrawingDrawing-745753.pdfPHASE 4 - 4500P03
    28 Oct 2016DrawingDrawing-695541.pdfPHASE 4 ENTERTAINMENT DOME SECTIONS B-B & C-C
    28 Oct 2016DrawingDrawing-695513.pdfPHASE 4 LEVEL 00 BLOCK PLAN
    14 May 2017DrawingDrawing-745744.pdfPHASE 4 - 4100P04
    14 May 2017DrawingDrawing-745745.pdfPHASE 4 - 4110P04
    14 May 2017DrawingDrawing-745746.pdfPHASE 4 - 4120P04
    14 May 2017DrawingDrawing-745747.pdfPHASE 4 - 4130P04
    14 May 2017DrawingDrawing-745748.pdfPHASE 4 - 4300P03
    14 May 2017DrawingDrawing-745749.pdfPHASE 4 - 4310P03
    28 Oct 2016DrawingDrawing-695500.pdfPHASE 3 PROPOSED SKI CENTRE SECTION A-A 1 OF 3
    28 Oct 2016DrawingDrawing-695503.pdfPHASE 3 PROPOSED SKI SLOPE SECTION A-A 2 OF 3
    28 Oct 2016DrawingDrawing-695504.pdfPHASE 3 PROPOSED SKI SLOPE SECTION A-A 3 OF 3
    28 Oct 2016DrawingDrawing-695505.pdfPHASE 3 PROPOSED SKI SLOPE SECTION B-B
    28 Oct 2016DrawingDrawing-695457.pdfPHASE 3 ROOF LEVEL BLOCK PLAN 1 OF 2
    28 Oct 2016DrawingDrawing-695459.pdfPHASE 3 ROOF LEVEL BLOCK PLAN 2 OF 2
    28 Oct 2016DrawingDrawing-695472.pdfPHASE 3 PROPOSED SKI CENTRE LEVEL 03 GA PLAN 1 OF 3
    28 Oct 2016DrawingDrawing-695474.pdfPHASE 3 PROPOSED SKI CENTRE LEVEL 03 GA PLAN 2 OF 3
    28 Oct 2016DrawingDrawing-695475.pdfPHASE 3 PROPOSED SKI CENTRE LEVEL 03 GA PLAN 3 OF 3
    28 Oct 2016DrawingDrawing-695478.pdfPHASE 3 PROPOSED SKI CENTRE ROOF LEVEL GA PLAN 1 OF 3
    28 Oct 2016DrawingDrawing-695480.pdfPHASE 3 PROPOSED SKI CENTRE ROOF LEVEL GA PLAN 2 OF 3
    28 Oct 2016DrawingDrawing-695486.pdfPHASE 3 PROPOSED SKI CENTRE ROOF LEVEL GA PLAN 3 OF 3
    28 Oct 2016DrawingDrawing-695464.pdfPHASE 3 PROPOSED SKI CENTRE LEVEL 01 GA PLAN 1 OF 3
    28 Oct 2016DrawingDrawing-695465.pdfPHASE 3 PROPOSED SKI CENTRE LEVEL 01 GA PLAN 2 OF 3
    28 Oct 2016DrawingDrawing-695466.pdfPHASE 3 PROPOSED SKI CENTRE LEVEL 01 GA PLAN 3 OF 3
    28 Oct 2016DrawingDrawing-695467.pdfPHASE 3 PROPOSED SKI CENTRE LEVEL 02 GA PLAN 1 OF 3
    28 Oct 2016DrawingDrawing-695468.pdfPHASE 3 PROPOSED SKI CENTRE LEVEL 02 GA PLAN 2 OF 3
    28 Oct 2016DrawingDrawing-695469.pdfPHASE 3 PROPOSED SKI CENTRE LEVEL 02 GA PLAN 3 OF 3
    28 Oct 2016DrawingDrawing-695494.pdfPHASE 3 PROPOSED SKI CENTRE ELEVATIONS 3.3
    28 Oct 2016DrawingDrawing-695495.pdfPHASE 3 PROPOSED SKI CENTRE ELEVATIONS 4.4
    28 Oct 2016DrawingDrawing-695496.pdfPHASE 3 PROPOSED SKI CENTRE ENLARGED BAY PLANS/ELEVATIONS
    28 Oct 2016DrawingDrawing-695461.pdfPHASE 3 PROPOSED SKI CENTRE LEVEL 00 GA PLAN 1 OF 3
    28 Oct 2016DrawingDrawing-695462.pdfPHASE 3 PROPOSED SKI CENTRE LEVEL 00 GA PLAN 2 OF 3
    28 Oct 2016DrawingDrawing-695463.pdfPHASE 3 PROPOSED SKI CENTRE LEVEL 00 GA PLAN 3 OF 3
    28 Oct 2016DrawingDrawing-695501.pdfPHASE 3 PROPOSED DAY VISITOR MULTI-STOREY CAR PARK ELEVATIONS 15 & SECTION B-B
    28 Oct 2016DrawingDrawing-695502.pdfPHASE 3 PROPOSED DAY VISITOR MULTI-STOREY CAR PARK ELEVATIONS 5.5
    28 Oct 2016DrawingDrawing-695490.pdfPHASE 3 PROPOSED SKI CENTRE ELEVATIONS 1-1 & 2-2
    28 Oct 2016DrawingDrawing-695492.pdfPHASE 3 PROPOSED SKI CENTRE ELEVATIONS 1.1
    28 Oct 2016DrawingDrawing-695493.pdfPHASE 3 PROPOSED SKI CENTRE ELEVATIONS 2.2
    28 Oct 2016DrawingDrawing-695491.pdfPHASE 3 PROPOSED SKI CENTRE ELEVATIONS 3-3 & 4-4
    28 Oct 2016DrawingDrawing-695456.pdfPHASE 3 LEVEL 03 BLOCK PLAN 2 OF 2
    28 Oct 2016DrawingDrawing-695487.pdfPHASE 3 PROPOSED DAY VISITOR CENTRE MULTI-STOREY CAR PARK GA PLAN LEVEL 01
    28 Oct 2016DrawingDrawing-695488.pdfPHASE 3 PROPOSED DAY VISITOR CENTRE MULTI-STOREY CAR PARK GA PLAN LEVEL 02
    28 Oct 2016DrawingDrawing-695489.pdfPHASE 3 PROPOSED DAY VISITOR CENTRE MULTI-STOREY CAR PARK ROOF LEVEL
    28 Oct 2016DrawingDrawing-695497.pdfPHASE 3 PROPOSED DAY VISITOR MULTI-STOREY CAR PARK ELEVATION 15 & SECTION B-B
    28 Oct 2016DrawingDrawing-695499.pdfPHASE 3 PROPOSED DAY VISITOR MULTI-STOREY CAR PARK ELEVATION 5.5
    28 Oct 2016DrawingDrawing-695447.pdfPHASE 3 LEVEL 00 BLOCK PLAN 2 OF 2
    28 Oct 2016DrawingDrawing-695448.pdfPHASE 3 LEVEL 01 BLOCK PLAN 1 OF 2
    28 Oct 2016DrawingDrawing-695450.pdfPHASE 3 LEVEL 01 BLOCK PLAN 2 OF 2
    28 Oct 2016DrawingDrawing-695451.pdfPHASE 3 LEVEL 02 BLOCK PLAN 1 OF 2
    28 Oct 2016DrawingDrawing-695453.pdfPHASE 3 LEVEL 02 BLOCK PLAN 2 OF 2
    28 Oct 2016DrawingDrawing-695455.pdfPHASE 3 LEVEL 03 BLOCK PLAN 1 OF 2
    14 May 2017DrawingDrawing-745739.pdfPHASE 3 - 3408P03
    14 May 2017DrawingDrawing-745740.pdfPHASE 3 - 3500P04
    14 May 2017DrawingDrawing-745741.pdfPHASE 3 - 3501P04
    14 May 2017DrawingDrawing-745742.pdfPHASE 3 - 3502P05
    14 May 2017DrawingDrawing-745743.pdfPHASE 3 - 3503P05
    28 Oct 2016DrawingDrawing-695446.pdfPHASE 3 LEVEL 00 BLOCK PLAN 1 OF 2
    14 May 2017DrawingDrawing-745733.pdfPHASE 3 - 3402P05
    14 May 2017DrawingDrawing-745734.pdfPHASE 3 - 3403P04
    14 May 2017DrawingDrawing-745735.pdfPHASE 3 - 3404P04
    14 May 2017DrawingDrawing-745736.pdfPHASE 3 - 3405P05
    14 May 2017DrawingDrawing-745737.pdfPHASE 3 - 3406P05
    14 May 2017DrawingDrawing-745738.pdfPHASE 3 - 3407P04
    14 May 2017DrawingDrawing-745726.pdfPHASE 3 - 3342P03
    14 May 2017DrawingDrawing-745727.pdfPHASE 3 - 3350P02
    14 May 2017DrawingDrawing-745729.pdfPHASE 3 - 3351P02
    14 May 2017DrawingDrawing-745730.pdfPHASE 3 - 3352P03
    14 May 2017DrawingDrawing-745731.pdfPHASE 3 - 3400P05
    14 May 2017DrawingDrawing-745732.pdfPHASE 3 - 3401P05
    14 May 2017DrawingDrawing-745719.pdfPHASE 3 - 3330P03
    14 May 2017DrawingDrawing-745720.pdfPHASE 3 - 3331P03
    14 May 2017DrawingDrawing-745721.pdfPHASE 3 - 3332P03
    14 May 2017DrawingDrawing-745722.pdfPHASE 3 - 3340P04
    14 May 2017DrawingDrawing-745723.pdfPHASE 3 - 3341P04
    14 May 2017DrawingDrawing-745724.pdfPHASE 3 - 3342P03
    14 May 2017DrawingDrawing-745713.pdfPHASE 3 - 3310P04
    14 May 2017DrawingDrawing-745714.pdfPHASE 3 - 3311P04
    14 May 2017DrawingDrawing-745715.pdfPHASE 3 - 3312P04
    14 May 2017DrawingDrawing-745716.pdfPHASE 3 - 3320P04
    14 May 2017DrawingDrawing-745717.pdfPHASE 3 - 3321P04
    14 May 2017DrawingDrawing-745718.pdfPHASE 3 - 3322P03
    14 May 2017DrawingDrawing-745707.pdfPHASE 3 - 3131P05
    14 May 2017DrawingDrawing-745708.pdfPHASE 3 - 3140P05
    14 May 2017DrawingDrawing-745709.pdfPHASE 3 - 3141P05
    14 May 2017DrawingDrawing-745710.pdfPHASE 3 - 3300P03
    14 May 2017DrawingDrawing-745711.pdfPHASE 3 - 3301P03
    14 May 2017DrawingDrawing-745712.pdfPHASE 3 - 3302P04
    14 May 2017DrawingDrawing-745701.pdfPHASE 3 - 3101P05
    14 May 2017DrawingDrawing-745702.pdfPHASE 3 - 3110P05
    14 May 2017DrawingDrawing-745703.pdfPHASE 3 - 3111P04
    14 May 2017DrawingDrawing-745704.pdfPHASE 3 - 3120P05
    14 May 2017DrawingDrawing-745705.pdfPHASE 3 - 3121P05
    14 May 2017DrawingDrawing-745706.pdfPHASE 3 - 3130P05
    28 Oct 2016DrawingDrawing-695425.pdfPHASE 2 PROPOSED ENERGY CENTRE LEVEL 01 GA PLAN
    28 Oct 2016DrawingDrawing-695426.pdfPHASE 2 PROPOSED ENERGY CENTRE ROOF LEVEL GA PLAN
    28 Oct 2016DrawingDrawing-695435.pdfPHASE 2 PROPOSED ENERGY CENTRE SECTIONS A-A & B-B
    28 Oct 2016DrawingDrawing-695429.pdfPHASE 2 WATER TREATMENT PLANT & ENERGY CENTRE ELEVATIONS
    14 May 2017DrawingDrawing-745698.pdfPHASE 3 - 3100P05
    14 May 2017DrawingDrawing-745699.pdfPHASE 3 - 3101P05
    28 Oct 2016DrawingDrawing-695428.pdfPHASE 2 PROPOSED EDUCATION CENTRE ELEVATIONS & ENLARGED BAY PLANS/ELEVATIONS
    28 Oct 2016DrawingDrawing-695379.pdfPHASE 2 PROPOSED EDUCATION CENTRE LEVEL 01 & ROOF LEVEL BLOCK PLAN
    28 Oct 2016DrawingDrawing-695422.pdfPHASE 2 PROPOSED EDUCATION CENTRE LEVEL 01 & ROOF LEVEL GA PLAN
    28 Oct 2016DrawingDrawing-695433.pdfPHASE 2 PROPOSED EDUCATION CENTRE SECTIONS A-A & B-B
    28 Oct 2016DrawingDrawing-695432.pdfPHASE 2 PROPOSED ENERGY CENTRE ENLARAGED BAY PLANS/ELEVATIONS
    28 Oct 2016DrawingDrawing-695409.pdfPHASE 2 PROPOSED ENERGY CENTRE LEVEL 01 & ROOF LEVEL BLOCK PLAN
    14 May 2017DrawingDrawing-745692.pdfPHASE 2 - 2400P03
    14 May 2017DrawingDrawing-745693.pdfPHASE 2 - 2410P03
    14 May 2017DrawingDrawing-745694.pdfPHASE 2 - 2410P03
    14 May 2017DrawingDrawing-745695.pdfPHASE 2 - 2411P03
    14 May 2017DrawingDrawing-745696.pdfPHASE 2 - 2500P03
    14 May 2017DrawingDrawing-745697.pdfPHASE 2 - 2510P02
    14 May 2017DrawingDrawing-745682.pdfOVERALL SITE - 0570P02
    14 May 2017DrawingDrawing-745686.pdfPHASE 2 - 2100P03
    14 May 2017DrawingDrawing-745688.pdfPHASE 2 - 2101P03
    14 May 2017DrawingDrawing-745689.pdfPHASE 2 - 2300P04
    14 May 2017DrawingDrawing-745690.pdfPHASE 2 - 2301P04
    14 May 2017DrawingDrawing-745691.pdfPHASE 2 - 2302P03
    14 May 2017DrawingDrawing-745676.pdfOVERALL SITE - 0540P03
    14 May 2017DrawingDrawing-745677.pdfOVERALL SITE - 0545P02
    14 May 2017DrawingDrawing-745678.pdfOVERALL SITE - 0550P02
    14 May 2017DrawingDrawing-745679.pdfOVERALL SITE - 0555P02
    14 May 2017DrawingDrawing-745680.pdfOVERALL SITE - 0560P02
    14 May 2017DrawingDrawing-745681.pdfOVERALL SITE - 0565P03
    14 May 2017DrawingDrawing-745670.pdfOVERALL SITE - 0510P03
    14 May 2017DrawingDrawing-745671.pdfOVERALL SITE - 0515P03
    14 May 2017DrawingDrawing-745672.pdfOVERALL SITE - 0520P02
    14 May 2017DrawingDrawing-745673.pdfOVERALL SITE - 0525P03
    14 May 2017DrawingDrawing-745674.pdfOVERALL SITE - 0530P04
    14 May 2017DrawingDrawing-745675.pdfOVERALL SITE - 0535P02
    14 May 2017DrawingDrawing-745664.pdfOVERALL SITE - 0046P06
    14 May 2017DrawingDrawing-745665.pdfOVERALL SITE - 0047P10
    14 May 2017DrawingDrawing-745666.pdfOVERALL SITE - 0048P02
    14 May 2017DrawingDrawing-745667.pdfOVERALL SITE - 0049P06
    14 May 2017DrawingDrawing-745668.pdfOVERALL SITE - 0500P03
    14 May 2017DrawingDrawing-745669.pdfOVERALL SITE - 0505P02
    14 May 2017DrawingDrawing-745658.pdfOVERALL SITE - 0040P08
    14 May 2017DrawingDrawing-745659.pdfOVERALL SITE - 0041P06
    14 May 2017DrawingDrawing-745660.pdfOVERALL SITE - 0042P05
    14 May 2017DrawingDrawing-745661.pdfOVERALL SITE - 0043P07
    14 May 2017DrawingDrawing-745662.pdfOVERALL SITE - 0044P06
    14 May 2017DrawingDrawing-745663.pdfOVERALL SITE - 0045P06
    31 Oct 2016DrawingDrawing-695311.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 9 OF 15)
    31 Oct 2016DrawingDrawing-696452.pdfLANDSCAPE MASTERPLAN SITE WIDE
    28 Oct 2016DrawingDrawing-696032.pdfLEVEL 00 SITE PLAN
    28 Oct 2016DrawingDrawing-696033.pdfLEVEL 01 SITE PLAN
    28 Oct 2016DrawingDrawing-696034.pdfLEVEL 02 SITE PLAN
    14 May 2017DrawingDrawing-745657.pdfOVERALL SITE - 0039P01
    31 Oct 2016DrawingDrawing-695304.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 4 OF 15)
    31 Oct 2016DrawingDrawing-695305.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 5 OF 15)
    31 Oct 2016DrawingDrawing-696186.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 6 OF 15)
    31 Oct 2016DrawingDrawing-695308.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 7 OF 15)
    31 Oct 2016DrawingDrawing-695309.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 8 OF 15)
    31 Oct 2016DrawingDrawing-695310.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 8 OF 15)
    31 Oct 2016DrawingDrawing-695313.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 12 OF 15)
    31 Oct 2016DrawingDrawing-695314.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 13 OF 15)
    31 Oct 2016DrawingDrawing-695315.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 14 OF 15)
    31 Oct 2016DrawingDrawing-695316.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 15 OF 15)
    31 Oct 2016DrawingDrawing-695302.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 2 OF 15)
    31 Oct 2016DrawingDrawing-695303.pdfLANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 3 OF 15)
    28 Oct 2016CorrespondenceCorrespondence-695332.pdfCOVERING LETTER
    28 Oct 2016CorrespondenceCorrespondence-695333.pdfSUPPORTING NOTES
    31 Oct 2016ReportReport-696075.pdfDETAILS OF CONSTRUCTION SPECIFICATION & SURFACING
    28 Oct 2016ReportReport-695335.pdfPHASE 1 D&A STATEMENT (PART 1 OF 2)
    28 Oct 2016ReportReport-695334.pdfPHASE 1 D&A STATEMENT (PART 2 OF 2)
    28 Oct 2016ReportReport-695368.pdfPHASE 2 D&A STATEMENT (PART 1 OF 3)
    28 Oct 2016ReportReport-695371.pdfPHASE 2 D&A STATEMENT (PART 2 OF 3)
    28 Oct 2016ReportReport-695372.pdfPHASE 2 D&A STATEMENT (PART 3 OF 3)
    28 Oct 2016ReportReport-696019.pdfTRAVEL ASSESSMENT - PART 6 - APPENDIX F.3
    28 Oct 2016ReportReport-696020.pdfTRAVEL ASSESSMENT - PART 7 - APPENDIX F.4
    28 Oct 2016ReportReport-696022.pdfTRAVEL ASSESSMENT - PART 8 - APPENDIX F.5
    28 Oct 2016ReportReport-696023.pdfTRAVEL ASSESSMENT - PART 9 - APPENDIX G
    28 Oct 2016ReportReport-696013.pdfTRAVEL PLAN
    31 Oct 2016ReportReport-695297.pdfSNOASIS PROJECT REGISTER
    28 Oct 2016ReportReport-696014.pdfTRAVEL ASSESSMENT - PART 1 - REPORT
    28 Oct 2016ReportReport-696015.pdfTRAVEL ASSESSMENT - PART 2 - FIGURES
    28 Oct 2016ReportReport-696016.pdfTRAVEL ASSESSMENT - PART 3 - APPENDICES A - E
    28 Oct 2016ReportReport-696017.pdfTRAVEL ASSESSMENT - PART 4 - APPENDIX F.1
    28 Oct 2016ReportReport-696018.pdfTRAVEL ASSESSMENT - PART 5 - APPENDIX F.2
    28 Oct 2016ReportReport-695899.pdfPHASE 8 D&A STATEMENT (PART 1 OF 2)
    28 Oct 2016ReportReport-695901.pdfPHASE 8 D&A STATEMENT (PART 2 OF 2)
    28 Oct 2016ReportReport-695904.pdfPHASE 8 DRAWING SCHEDULE
    28 Oct 2016ReportReport-696011.pdfPLANNING STATEMENT
    28 Oct 2016ReportReport-696012.pdfSECURE BY DESIGN CHECKLIST
    28 Oct 2016ReportReport-696010.pdfSITE WIDE DRAWING SCHEDULE
    28 Oct 2016ReportReport-695723.pdfPHASE 6 D&A STATEMENT (PART 1 OF 2)
    28 Oct 2016ReportReport-695724.pdfPHASE 6 D&A STATEMENT (PART 2 OF 2)
    28 Oct 2016ReportReport-695728.pdfPHASE 6 DRAWING SCHEDULE
    28 Oct 2016ReportReport-695854.pdfPHASE 7 D&A STATEMENT (PART 1 OF 2)
    28 Oct 2016ReportReport-695859.pdfPHASE 7 D&A STATEMENT (PART 2 OF 2)
    28 Oct 2016ReportReport-695860.pdfPHASE 7 DRAWING SCHEDULE
    28 Oct 2016ReportReport-695507.pdfPHASE 4 D&A STATEMENT (PART 2 OF 2)
    28 Oct 2016ReportReport-695508.pdfPHASE 4 DRAWING SCHEDULE
    28 Oct 2016ReportReport-695542.pdfPHASE 5 D&A STATEMENT (PART 1 OF 3)
    28 Oct 2016ReportReport-695543.pdfPHASE 5 D&A STATEMENT (PART 2 OF 3)
    28 Oct 2016ReportReport-695544.pdfPHASE 5 D&A STATEMENT (PART 3 OF 3)
    28 Oct 2016ReportReport-695545.pdfPHASE 5 DRAWING SCHEDULE
    28 Oct 2016ReportReport-695373.pdfPHASE 2 DRAWING SCHEDULE
    28 Oct 2016ReportReport-695439.pdfPHASE 3 D&A STATEMENT (PART 1 OF 3)
    28 Oct 2016ReportReport-695440.pdfPHASE 3 D&A STATEMENT (PART 2 OF 3)
    28 Oct 2016ReportReport-695441.pdfPHASE 3 D&A STATEMENT (PART 3 OF 3)
    28 Oct 2016ReportReport-695444.pdfPHASE 3 DRAWING SCHEDULE
    28 Oct 2016ReportReport-695506.pdfPHASE 4 D&A STATEMENT (PART 1 OF 2)
    03 Feb 2017Public CommentPublic Comment-713526.pdf
    / TIF Doc
    COMMENT
    03 Jan 2017Public CommentPublic Comment-705947.pdf
    / TIF Doc/ Public Comment-705947 Thumbnails
    PUBLIC COMMENT
    24 Nov 2016Public CommentPublic Comment-699079.pdfSUPPORT COMMENT
    30 Jan 2017Public CommentPublic Comment-711597.pdfSUPPORT COMMENT
    24 Dec 2016Consultee CommentConsultee Comment-705669.pdfBRAMFORD PARISH COMMENT
    01 Dec 2016Consultee CommentConsultee Comment-700774.pdfENVIRONMENT AGENCY COMMENT
    07 Dec 2016Consultee CommentConsultee Comment-701934.pdfENVIRONMENTAL HEALTH (AIR QUALITY) COMMENT
    07 Dec 2016Consultee CommentConsultee Comment-701932.pdfENVIRONMENTAL HEALTH (LAND CONTAMINATION) COMMENT
    18 Nov 2016Consultee CommentConsultee Comment-698683.pdfENVIRONMENTAL HEALTH (SUSTAINABILITY) COMMENT
    05 Dec 2016Consultee CommentConsultee Comment-701670.pdfENVIRONMENTAL HEALTH OFFICER (OTHER) COMMENTS
    14 Dec 2016Consultee CommentConsultee Comment-703158.pdf
    / TIF Doc/ Consultee Comment-703158 Thumbnails
    MOD COMMENTS
    19 Dec 2016Consultee CommentConsultee Comment-704133.pdfNATURAL ENGLAND COMMENTS
    19 Dec 2016Consultee CommentConsultee Comment-704456.pdfSPORTS ENGLAND COMMENTS
    15 Dec 2016Consultee CommentConsultee Comment-703259.pdfSPROUGHTON PARISH COMMENTS
    19 Dec 2016Consultee CommentConsultee Comment-704223.pdf
    / TIF Doc/ Consultee Comment-704223 Thumbnails
    SPROUGHTON PARISH COMMENTS
    19 Dec 2016Consultee CommentConsultee Comment-704107.pdfSUFFOLK WILDLIFE TRUST COMMENTS
    17 Nov 2016Consultee CommentConsultee Comment-697867.pdfESSEX & SUFFOLK WATER COMMENTS
    21 Nov 2016Consultee CommentConsultee Comment-698687.pdfFLOOD & WATER MANAGEMENT COMMENT
    13 Jan 2017Consultee CommentConsultee Comment-709058.pdfGREAT BLAKENHAM PARISH COMMENTS
    13 Dec 2016Consultee CommentConsultee Comment-702835.pdf
    / TIF Doc/ Consultee Comment-702835 Thumbnails
    HIGHWAYS ENGLAND COMMENT
    07 Dec 2016Consultee CommentConsultee Comment-701968.pdf
    / TIF Doc/ Consultee Comment-701968 Thumbnails
    HISTORIC ENGLAND COMMENT RECEIVED
    11 Jan 2017Consultee CommentConsultee Comment-707359.pdfLITTLE BLAKENHAM PARISH COMMENTS
    14 May 2017Additional InformationAdditional Information-745602.pdfARTIFICIAL LIGHTING STRATEGY
    14 May 2017Additional InformationAdditional Information-745605.pdfCONSTRUCTION METHOD STATEMENT
    14 May 2017Additional InformationAdditional Information-745601.pdfCOVERING LETTER - MAY 2017
    14 May 2017Additional InformationAdditional Information-745606.pdfDRAINAGE REPORT
    14 May 2017Additional InformationAdditional Information-745540.pdfECOLOGY - MANAGEMENT AND MITIGATION
    14 May 2017Additional InformationAdditional Information-745539.pdfECOLOGY - MANAGEMENT AND MITIGATION POND KEY
    14 May 2017Additional InformationAdditional Information-745622.pdfSTRUCTURAL REPORT - PHASE 8
    14 May 2017Additional InformationAdditional Information-745613.pdfSUSTAINABILITY STATEMENT
    14 May 2017Additional InformationAdditional Information-745614.pdfTRANSPORT ASSESSMENT ADDENDUM
    14 May 2017Additional InformationAdditional Information-745615.pdfUTILITY REPORT
    14 May 2017Additional InformationAdditional Information-745616.pdfSTRUCTURAL REPORT - PHASE 2
    14 May 2017Additional InformationAdditional Information-745617.pdfSTRUCTURAL REPORT - PHASE 3
    14 May 2017Additional InformationAdditional Information-745618.pdfSTRUCTURAL REPORT - PHASE 4
    14 May 2017Additional InformationAdditional Information-745619.pdfSTRUCTURAL REPORT - PHASE 5
    14 May 2017Additional InformationAdditional Information-745620.pdfSTRUCTURAL REPORT - PHASE 6
    14 May 2017Additional InformationAdditional Information-745621.pdfSTRUCTURAL REPORT - PHASE 7
    14 May 2017Additional InformationAdditional Information-745624.pdfLANDSCAPE - PLANTING SCHEDULES AND SPEC
    14 May 2017Additional InformationAdditional Information-745600.pdfLETTER FROM THE APPLICANT - MAY 2017
    14 May 2017Additional InformationAdditional Information-745604.pdfMEP STRATEGY CONCEPT
    14 May 2017Additional InformationAdditional Information-745610.pdfOPERATIONAL WASTE MANAGEMENT STRATEGY
    14 May 2017Additional InformationAdditional Information-745612.pdfPLANNING STATEMENT - MAY 2017
    14 May 2017Additional InformationAdditional Information-745611.pdfSITE WASTE MANAGEMENT STRATEGY
    14 May 2017Additional InformationAdditional Information-745651.pdfLANDSCAPE - PLANTING PLAN 310A
    14 May 2017Additional InformationAdditional Information-745652.pdfLANDSCAPE - PLANTING PLAN 311A
    14 May 2017Additional InformationAdditional Information-745653.pdfLANDSCAPE - PLANTING PLAN 312A
    14 May 2017Additional InformationAdditional Information-745654.pdfLANDSCAPE - PLANTING PLAN 313A
    14 May 2017Additional InformationAdditional Information-745655.pdfLANDSCAPE - PLANTING PLAN 314A
    14 May 2017Additional InformationAdditional Information-745656.pdfLANDSCAPE - PLANTING PLAN 315A
    14 May 2017Additional InformationAdditional Information-745645.pdfLANDSCAPE - PLANTING PLAN 304A
    14 May 2017Additional InformationAdditional Information-745646.pdfLANDSCAPE - PLANTING PLAN 305A
    14 May 2017Additional InformationAdditional Information-745647.pdfLANDSCAPE - PLANTING PLAN 306A
    14 May 2017Additional InformationAdditional Information-745648.pdfLANDSCAPE - PLANTING PLAN 307A
    14 May 2017Additional InformationAdditional Information-745649.pdfLANDSCAPE - PLANTING PLAN 308A
    14 May 2017Additional InformationAdditional Information-745650.pdfLANDSCAPE - PLANTING PLAN 309A
    14 May 2017Additional InformationAdditional Information-745640.pdfLANDSCAPE - GA PLAN 214B
    14 May 2017Additional InformationAdditional Information-745641.pdfLANDSCAPE - GA PLAN 215B
    14 May 2017Additional InformationAdditional Information-745626.pdfLANDSCAPE - MASTERPLAN
    14 May 2017Additional InformationAdditional Information-745642.pdfLANDSCAPE - PLANTING PLAN 301A
    14 May 2017Additional InformationAdditional Information-745643.pdfLANDSCAPE - PLANTING PLAN 302A
    14 May 2017Additional InformationAdditional Information-745644.pdfLANDSCAPE - PLANTING PLAN 303A
    14 May 2017Additional InformationAdditional Information-745634.pdfLANDSCAPE - GA PLAN 208B
    14 May 2017Additional InformationAdditional Information-745635.pdfLANDSCAPE - GA PLAN 209B
    14 May 2017Additional InformationAdditional Information-745636.pdfLANDSCAPE - GA PLAN 210B
    14 May 2017Additional InformationAdditional Information-745637.pdfLANDSCAPE - GA PLAN 211B
    14 May 2017Additional InformationAdditional Information-745638.pdfLANDSCAPE - GA PLAN 212B
    14 May 2017Additional InformationAdditional Information-745639.pdfLANDSCAPE - GA PLAN 213B
    14 May 2017Additional InformationAdditional Information-745628.pdfLANDSCAPE - GA PLAN 202B
    14 May 2017Additional InformationAdditional Information-745629.pdfLANDSCAPE - GA PLAN 203B
    14 May 2017Additional InformationAdditional Information-745630.pdfLANDSCAPE - GA PLAN 204B
    14 May 2017Additional InformationAdditional Information-745631.pdfLANDSCAPE - GA PLAN 205B
    14 May 2017Additional InformationAdditional Information-745632.pdfLANDSCAPE - GA PLAN 206C
    14 May 2017Additional InformationAdditional Information-745633.pdfLANDSCAPE - GA PLAN 207B
    14 May 2017Additional InformationAdditional Information-745603.pdfFIRE STRATEGY CONCEPT
    14 May 2017Additional InformationAdditional Information-745608.pdfGROUND STABILITY STATEMENT
    14 May 2017Additional InformationAdditional Information-745609.pdfLANDFILL RISK ASSESSMENT
    14 May 2017Additional InformationAdditional Information-745623.pdfLANDSCAPE - DESIGN STATEMENT
    14 May 2017Additional InformationAdditional Information-745625.pdfLANDSCAPE - DRAWINGS SCHEDULE
    14 May 2017Additional InformationAdditional Information-745627.pdfLANDSCAPE - GA PLAN 201C
    14 May 2017Additional InformationAdditional Information-745593.pdfENVIRONMENTAL STATEMENT - VOL III APPENDIX 6-A
    14 May 2017Additional InformationAdditional Information-745594.pdfENVIRONMENTAL STATEMENT - VOL III APPENDIX 6-B
    14 May 2017Additional InformationAdditional Information-745595.pdfENVIRONMENTAL STATEMENT - VOL III APPENDIX 6-C
    14 May 2017Additional InformationAdditional Information-745596.pdfENVIRONMENTAL STATEMENT - VOL III APPENDIX 6-D
    14 May 2017Additional InformationAdditional Information-745597.pdfENVIRONMENTAL STATEMENT - VOL III APPENDIX 6-E
    14 May 2017Additional InformationAdditional Information-745598.pdfENVIRONMENTAL STATEMENT - VOL III APPENDIX 6-F
    14 May 2017Additional InformationAdditional Information-745546.pdfENVIRONMENTAL STATEMENT - CHAPTER 5
    14 May 2017Additional InformationAdditional Information-745547.pdfENVIRONMENTAL STATEMENT - CHAPTER 6
    14 May 2017Additional InformationAdditional Information-745548.pdfENVIRONMENTAL STATEMENT - CHAPTER 7
    14 May 2017Additional InformationAdditional Information-745549.pdfENVIRONMENTAL STATEMENT - CHAPTER 8
    14 May 2017Additional InformationAdditional Information-745550.pdfENVIRONMENTAL STATEMENT - CHAPTER 9
    14 May 2017Additional InformationAdditional Information-745599.pdfENVIRONMENTAL STATEMENT - NON TECHNICAL SUMMARY
    14 May 2017Additional InformationAdditional Information-745556.pdfENVIRONMENTAL STATEMENT - CHAPTER 15
    14 May 2017Additional InformationAdditional Information-745557.pdfENVIRONMENTAL STATEMENT - CHAPTER 16
    14 May 2017Additional InformationAdditional Information-745558.pdfENVIRONMENTAL STATEMENT - CHAPTER 17
    14 May 2017Additional InformationAdditional Information-745543.pdfENVIRONMENTAL STATEMENT - CHAPTER 2
    14 May 2017Additional InformationAdditional Information-745544.pdfENVIRONMENTAL STATEMENT - CHAPTER 3
    14 May 2017Additional InformationAdditional Information-745545.pdfENVIRONMENTAL STATEMENT - CHAPTER 4
    14 May 2017Additional InformationAdditional Information-745542.pdfENVIRONMENTAL STATEMENT - CHAPTER 1
    14 May 2017Additional InformationAdditional Information-745551.pdfENVIRONMENTAL STATEMENT - CHAPTER 10
    14 May 2017Additional InformationAdditional Information-745552.pdfENVIRONMENTAL STATEMENT - CHAPTER 11
    14 May 2017Additional InformationAdditional Information-745553.pdfENVIRONMENTAL STATEMENT - CHAPTER 12
    14 May 2017Additional InformationAdditional Information-745554.pdfENVIRONMENTAL STATEMENT - CHAPTER 13
    14 May 2017Additional InformationAdditional Information-745555.pdfENVIRONMENTAL STATEMENT - CHAPTER 14
    14 May 2017Additional InformationAdditional Information-745580.pdfENVIRONMENTAL STATEMENT - APPENDIX 8-B
    14 May 2017Additional InformationAdditional Information-745581.pdfENVIRONMENTAL STATEMENT - APPENDIX 8-C
    14 May 2017Additional InformationAdditional Information-745582.pdfENVIRONMENTAL STATEMENT - APPENDIX 8-D PT1
    14 May 2017Additional InformationAdditional Information-745583.pdfENVIRONMENTAL STATEMENT - APPENDIX 8-D PT2
    14 May 2017Additional InformationAdditional Information-745584.pdfENVIRONMENTAL STATEMENT - APPENDIX 9-A
    14 May 2017Additional InformationAdditional Information-745585.pdfENVIRONMENTAL STATEMENT - APPENDIX 9-B
    14 May 2017Additional InformationAdditional Information-745574.pdfENVIRONMENTAL STATEMENT - APPENDIX 6-E
    14 May 2017Additional InformationAdditional Information-745575.pdfENVIRONMENTAL STATEMENT - APPENDIX 6-F
    14 May 2017Additional InformationAdditional Information-745576.pdfENVIRONMENTAL STATEMENT - APPENDIX 7-A PT1
    14 May 2017Additional InformationAdditional Information-745577.pdfENVIRONMENTAL STATEMENT - APPENDIX 7-A PT2
    14 May 2017Additional InformationAdditional Information-745578.pdfENVIRONMENTAL STATEMENT - APPENDIX 7-B
    14 May 2017Additional InformationAdditional Information-745579.pdfENVIRONMENTAL STATEMENT - APPENDIX 8-A
    14 May 2017Additional InformationAdditional Information-745568.pdfENVIRONMENTAL STATEMENT - APPENDIX 5-H
    14 May 2017Additional InformationAdditional Information-745569.pdfENVIRONMENTAL STATEMENT - APPENDIX 5-I
    14 May 2017Additional InformationAdditional Information-745570.pdfENVIRONMENTAL STATEMENT - APPENDIX 6-A
    14 May 2017Additional InformationAdditional Information-745571.pdfENVIRONMENTAL STATEMENT - APPENDIX 6-B
    14 May 2017Additional InformationAdditional Information-745572.pdfENVIRONMENTAL STATEMENT - APPENDIX 6-C
    14 May 2017Additional InformationAdditional Information-745573.pdfENVIRONMENTAL STATEMENT - APPENDIX 6-D
    14 May 2017Additional InformationAdditional Information-745562.pdfENVIRONMENTAL STATEMENT - APPENDIX 5-B
    14 May 2017Additional InformationAdditional Information-745563.pdfENVIRONMENTAL STATEMENT - APPENDIX 5-C
    14 May 2017Additional InformationAdditional Information-745564.pdfENVIRONMENTAL STATEMENT - APPENDIX 5-D
    14 May 2017Additional InformationAdditional Information-745565.pdfENVIRONMENTAL STATEMENT - APPENDIX 5-E
    14 May 2017Additional InformationAdditional Information-745566.pdfENVIRONMENTAL STATEMENT - APPENDIX 5-F
    14 May 2017Additional InformationAdditional Information-745567.pdfENVIRONMENTAL STATEMENT - APPENDIX 5-G
    14 May 2017Additional InformationAdditional Information-745588.pdfENVIRONMENTAL STATEMENT - APPENDIX 11-A
    14 May 2017Additional InformationAdditional Information-745589.pdfENVIRONMENTAL STATEMENT - APPENDIX 11-B
    14 May 2017Additional InformationAdditional Information-745590.pdfENVIRONMENTAL STATEMENT - APPENDIX 11-C
    14 May 2017Additional InformationAdditional Information-745591.pdfENVIRONMENTAL STATEMENT - APPENDIX 15-A
    14 May 2017Additional InformationAdditional Information-745592.pdfENVIRONMENTAL STATEMENT - APPENDIX 15-B
    14 May 2017Additional InformationAdditional Information-745561.pdfENVIRONMENTAL STATEMENT - APPENDIX 5-A
    14 May 2017Additional InformationAdditional Information-745541.pdfECOLOGY - S106 EXTRACT
    14 May 2017Additional InformationAdditional Information-745607.pdfENERGY STATEMENT
    14 May 2017Additional InformationAdditional Information-745559.pdfENVIRONMENTAL STATEMENT - APPENDIX 1-A
    14 May 2017Additional InformationAdditional Information-745560.pdfENVIRONMENTAL STATEMENT - APPENDIX 1-B
    14 May 2017Additional InformationAdditional Information-745586.pdfENVIRONMENTAL STATEMENT - APPENDIX 10-A
    14 May 2017Additional InformationAdditional Information-745587.pdfENVIRONMENTAL STATEMENT - APPENDIX 10-B

    A Northern Bypass would strengthen this development further.
     
    Welcome to the new IPSWI beta!
  2. martinc

    martincMember

    Good grief, thought it was dead! That lot suggests it's far from it, there's a considerable investment with that planning condition submission.
     
  3. dan5

    dan5ModeratorStaff Member

    It seems to me to be a bit more significant than just keeping the application active. I have absolutely no interest in winter sports and it isn't going to be good for the environment or scenic landscape, but it will create a destination that will attract thousands of people and will create employment. I think a lot of the jobs could benefit university students as part time jobs.

    The closest Suffolk currently has is Pleasurewood Hills in Lowestoft (I doubt it is that high up peoples wish list for theme parks) and Suffolk Wildlife Park (Africa Alive) both to the north of the county. Something further down, easier accessible from London etc. would be great.
     
  4. martinc

    martincMember

    Though its not so much theme park as Centre Parcs on Ice so far as I can tell. Lots of sporting activities (albeit icY ones), spas, restaurants etc. (like Centre Parcs) with lots of chalet tYpe accommodation, like CP. So probablY aimed quite up market (like CP is, or at least was) and quite priceY.  So not like tattY pleasurewood Hills at all.  Not that I've been there for a long while, but compared with the Alton Towers and Chessingtons of this World, not comparable.. Its about same league as Colchester Zoo.

    Although looking at those plans we have putting, we have a three hole golf course!, we have an "academY" area with lots of different sorts of sports pitches...
     

IPSWI beta